I ve done a few 4x8 planks with screws at that frequency.
Screws per sheet of sub floor.
In cases where latex subfloor glue is required careful selection is necessary due to the wide range of performance between brands.
According to construction and renovation experts some of the best screws for subfloor include the senco 08200y screws the simpson strong tie screws and the hillman group 48248 subfloor screws.
Attach the smaller piece to the subfloor with a 1 inch wood screw every six inches in each direction using a power drill.
According to table r602 3 1 of international residential code irc subfloor fastener schedule is as follows.
Be sure the joists are dry and free of dirt before applying.
Drill screws through the backerboard sheets every 6 to 8 inches.
This simple sub floor materials calculator will provide you with the lineal feet of floor joist needed the number of sheaths to cover the floor and how much glue and how many screws it takes to attach the sheathing to the joist.
Man that s a lot of screws.
The floor looks like the skin of an airplane with so many screws around the perimeter.
Push the full sheet tightly against the small section of plywood and the.
Nail spacing for sheets of osb and plywood is 8 inches per nail.
4 feet equals 48 inches which you then divide by 8 to determine that you ll need six nails where the board comes in contact with a truss.
Position the screws at least 1 2 inch but no more than 2 inches from the edge of the sheet.
Use a solvent based glue that meets astm d3498 performance standards.
Am i on the right track.
The first two of these come with a nice yellow zinc finish while the hillman group screws are unassuming yet tough in basic black.
The screw count is a bit high at times but this will allow for losing some.
Apply glue per manufacturer s specifications.
Drive the screws in so that the heads are slightly below the surface of the backerboard sheet.